Complete inventory of spare parts and materials. P}a WNd|2Svk=vq!xKv!`,8h@ ` 8`M9e D `TD>'5m4dZppSs$+{43 ]EY endstream endobj startxref Available, on site, at all times during construction. [l*/ SECTON 16010 - GENERAL PROVISIONS 16010 - General Provisions.doc PART 1 GENERAL 1.01 Work Included .1 Provide all labour, materials, equipment, services and supervision required to provide a complete electrical system as listed herein and shown on the drawings. All adjustments and modifications shall be provided by the bidder and appropriate subcontractors at no additional cost to the project. Examples of Sub Systems: Normal Power. Also turn off Underlines.) Diagrams shall indicate cable on raceway between points. Samples shall indicate applicable specification Remove and replace Work not conforming to requirements of the Contract Documents. PROVISIONS FOR ACCESS Furnish and install adequate access to all electrical components. Any work covered prior to any inspection in a manner which, in the inspector's opinion, precludes a complete inspection shall be uncovered at the installers cost. Supplementary Conditions and Division-1 Specification Sections, apply to this Section. But opting out of some of these cookies may have an effect on your browsing experience. hb```b````a``eg@ ~f(0wPN A8.I.qk``Fx6I This includes but is not limited to updating Equipment and/or Material Model Numbers indicated in the specifications and adding any additional specifications that may be required by the project. Arrange for each installer of equipment that requires regular maintenance to meet with the Owner's personnel to provide instruction in proper operation and maintenance. Installer of specialized systems such as Fire Alarms, telecommunication systems, etc. Section 16010 General Electrical Provisions Section 16120 Wire and Cables Section 16130 Wiring Devices Section 16160 Pilot Devices . All existing unsealed penetrations for services passing through existing rated assemblies within the project area shall be provided with sealant materials. Deep groove ball bearing. Section 16010 - General Electrical Requirements . PART 3 EXECUTION ROUGHIN Verify final locations for rough-ins with field measurements and with the requirements of the actual equipment to be connected. 0 The Engineer shall decide on the item and manner in which the work shall be provided. Remove wiring and conduit back to source panelboard or switch, or to last remaining device on the circuit. Housekeeping Pads: Set all floor-mounted equipment on four (4) inch high concrete housekeeping pads, unless otherwise shown or specified. 11-254 95% Construction Document Submission Phase January 03, 2012 BASIC ELECTRICAL REQUIREMENTS 260000 / = > ? APPROVED EQUAL EQUIPMENT LAYOUTS Approved Equal Equipment Layouts: The equipment layouts and the related mechanical and electrical service connections, access space and supports indicated on the construction documents represent equipment provided by the specified basis of design manufacturer and model number. E. Test Data . With super-finished raceways and controlled geometries, our premium design helps ensure consistent quality. 0000001525 00000 n endstream endobj 879 0 obj <. Mix grout according to manufacturer's printed instructions. It shall be the responsibility of the Installer to obtain all necessary data from the equipment supplied under other Divisions. endstream endobj startxref Before initiating any work, a job specific work plan must be developed by the contractor. PART 2 PRODUCTS LISTED MANUFACTURERS: Listed Manufacturers: The listed manufacturers indicated in Part 2 of each specification section as the basis of design represents the minimum level of quality for materials and equipment that is acceptable to UMB. 1912 0 obj <>stream l2f71S-K#C@EM{Wtq State of Maryland Fire Prevention Code. Comply with manufacturer's instructions. Place grout around anchors. 1 0 obj 5. 264 0 obj <> endobj The electrical installer shall utilize a full time project foreman in charge of all electrical work. The convenience socket outlet and exhaust fan shall have a cross section of 4mm and a circuit breaker (1 x 16 A + N) unless otherwise mentioned on drawings. The layered electronic files shall allow building elements, building systems and sub systems to be viewed in isolation or in combinations that are user selectable when the drawing files are being displayed. Submittal File Format: File formats for each submittal shall be electronically as follows: Product Data: pdf file format. See Specification Division 01 for general requirements. Work with the other trades to ensure the material and equipment installed as part on the electrical system will not be in conflict with the installation of material and equipment by the other trade contractors. Make all necessary investigations as to locations of utilities and all other matters which can affect the work. Coordinate installation of identifying devices after completing covering and painting where devices are applied to surfaces. Obtain all necessary permits from hbbd``b` $V Fg $s6e"A?a)L:= S ` + containing a completed specification Section 17015 will be automatically considered unresponsive and will be rejected. %PDF-1.6 % 571 0 obj <> endobj 2006 0 obj <> endobj Do not include this data in the Product Submittals. See underlined texts for Edits. vol. hb```f``2c`a``cc@ >+PRQ0yXgZ-*``z=;K7<72a`19 7h9EmGn6]lyjz\t^io K7] 7x9L+N$ ?ylU#^yr08-;dg{w.\6%n#{6k5SnLl2sP$k$GI,2L For compressorized equipment include an additional three (3) year Guarantee/Warranty Period. %%EOF Refer to Division 01 Section "Definitions and Standards" for definition of "experienced Installer." Pa>hRjf4L4)@5C'2O4)@5C'^T3}2-IT3}2-Iid>qd|'2.@5C'2& 1? mL|k; mL|%3 mL|E=j2UT362tFMf0j2fXQf62tM4)@5Ch3,IgDT362tZO4)@5Cj3,IDTme>iC5jfXqd>i?j2m4|z7j2Ou|GVvx6p+j6*|orw~~qyri{7g2a AoO{z'ZwoFOP1p(Cs&.8dnvr{x8^|\hyuba4w/Axu (p8g\n4d,K%T?Hd2nZirM0%H K y}?3S}~I4H>_yUuSxIZ C7F"T!5b~Q0; 1835 0 obj <>/Filter/FlateDecode/ID[<436FD37774A5B745BAA68B131E232EA6>]/Index[1820 93]/Info 1819 0 R/Length 81/Prev 195435/Root 1821 0 R/Size 1913/Type/XRef/W[1 2 1]>>stream Section 16050 - Basic Electrical Materials and Methods . }SC8/(|X.8\NspWb].uHh8w/0>uxEu$H>THbhOZd4 Protect the structure, furnishings, finishes, and adjacent materials not indicated or scheduled to be removed. F. Supply Voltage ELECTRICAL. Remove and replace defective Work. These cookies will be stored in your browser only with your consent. service companies, and controlling agencies. %%EOF The contractor shall include in his price the cost of all premium time required for outages and other work which interferes with the normal use of the building, which will be performed, in most cases, during other than normal work time and at the convenience of the University. EU PRODUCT DIRECTIVES a) The EU Product Directives deal with large families of products or horizontal risks, such as those addressed in the Electromagnetic &%`T$cf:A5H(3Jy?'- ] SUBMITTALS General: For general requirements see Architectural Specification Division 01 Section "Submittal Procedures". Approved substitutions, Contract Modifications, RFI responses and actual equipment and materials installed. endobj 11282 0 obj <>stream Sequence, coordinate, and integrate installations of mechanical materials and equipment for efficient flow of the Work. TURF CLUB 16010-1 GENERAL PROVISIONS MASTER F:\WORDPROC\ZEIJOBS\883-001\16010 SECTION 16010 GENERAL PROVISIONS PART 1 - GENERAL Related Documents: Drawings and general provisions of the contract, including General and Supplementary Conditions and Division 1 Specification sections, apply to this section. a$gd;F $ ELECTRICAL GENERAL PROVISIONS . Listing and Labeling: Provide products specified in this Section that are listed and labeled. endstream endobj startxref %PDF-1.6 % INSPECTIONS Contractor shall: Schedule, pay for (as applicable) and attend all inspections required by the Authorities Having Jurisdiction. 1820 0 obj <> endobj xref Remove all electrical clippings, wiring, nuts, bolts, etc. Comply with requirements of governing regulations, franchised service companies, and controlling agencies. Shutdown. Control sequences. 3 electrical and mechanical specifications, specifications for electrical unit substation . 590 0 obj <>stream HdSMo0W(jId]6t=K"N[ #$_^K.!Ze9dV0rOV\J`F@K6c,td6_b!JUjke3UK^mSw\,}GAqsv@qhnb/mWRj+'jXo4Zg|%>S9|WVTRn'p#X18G\R%0L|["l\pzJxFqLxX#4\;c?(=;7HZ\Y6+I(1LDe[9mAMwd]U'Gh-cEIV\# ,4cJ%P)iqOD%1x1Z=. ph p h8 B* Place grout to completely fill equipment bases. 11275 0 obj <>/Filter/FlateDecode/ID[<1BCD9CA6C4893D4A874390606B4A9A2F>]/Index[11261 22]/Info 11260 0 R/Length 76/Prev 791633/Root 11262 0 R/Size 11283/Type/XRef/W[1 2 1]>>stream service companies, and controlling agencies. Energized electrical conductors and circuit parts to which an employee might be exposed shall be put into an electrically safe work condition before an employee performs work any time the employee is within the limited approach boundary or, where an increased risk of injury from an exposure to an arc flash hazard exists. B. Servicing. Cover temporary openings for electrical equipment to prevent the entrance of water, dirt, debris, and other foreign matter. DTW Works Master Specification Section 16061- Grounding -Primary Issued 2005/06/01 PART 1 GENERAL 1.1 RELATED SECTIONS .1 Section 16010 - Electrical General Requirements. Coordinate connection of electrical systems with exterior underground and overhead utilities and services. Hazards. @W|$" endobj SECTION 16010 GENERAL REQUIREMENTS PART 1 - GENERAL 1.1 Description This Division includes the complete installation of power, control, instrumentation, wiring, lighting, and other electrical systems as specified in the Sections of Division 16. Product data as specified in the electrical specifications unless otherwise noted: Warranties and maintenance instructions shall be included in the O & M Manual only. UMB Energized Work Permit: A UMB Energized Work Permit is required for any work on energized circuits or equipment. Motor manufacturer, motor type or model . Install identifying devices prior to installing acoustical ceilings and similar concealment. OSHA (Occupational Safety & Health Act). endstream endobj startxref Power Distribution System. Div. PROTECTION OF WORK Protect work, material and equipment from weather and construction operations before and after installation. BICSI and NICET certification, where required by these specifications. {s@_yj1' 3{J1tB;=6bcC. Patch finished surfaces and building components using new materials specified for the original installation and experienced Installers. SECTION 16010 BASIC ELECTRICAL REQUIREMENTS . B. Show all access doors for concealed junction boxes devices. unless otherwise noted. Out of these cookies, the cookies that are categorized as necessary are stored on your browser as they are essential for the working of basic functionalities of the website. NETA (National Electrical Testing Association). i`h@M=#2Km,Iu9#y9Rd$gM$d,kVoN;$cJ+_:P:X:/}2P*C2P*C2X*c2X*c2X*cvgYt_{Mw?m{_/9Kt?to5hYE^E]_n]6#_\yn|02+=0PM1@T36YaeCb.c$PfHmT18f@5i32FMfp?M Include a detailed review of the following items: Maintenance manuals, including a customized list of preventive maintenance items and annual schedule for maintenance. CA-1817 / PN15160009 16010 - 1 DIVISION 16 - ELECTRICAL SECTION 16010 - GENERAL ELECTRICAL PROVISIONS PART 1 - GENERAL 1.01 INTENT OF SPECIFICATIONS AND DRAWINGS A. In default thereof, owner may have such work done and charge the cost of same to the contractor. Place grout on concrete bases to provide a smooth bearing surface for equipment. Effective energy utilization. All electrical outages which will interfere with the normal use of the building in any manner shall be done at such times as shall be mutually agreed upon by the contractor and the Office of Facilities Management. WORK PERFORMANCE All electrical work must comply with the requirements of NFPA 70 (NEC), NFPA 70B, NFPA 70E, OSHA Part 1910 subpart J, OSHA Part 1910 subpart S and OSHA Part 1910 subpart K in addition to other references required by the contract. Electrical inspection shall be by the [third (3rd) Party Inspector approved by the Maryland State Fire Marshall] [UMB inspection department personnel]. % Listing and Labeling Agency Qualifications: A Nationally Recognized Testing Laboratory (NRTL) as defined in OSHA Regulation 1910.7. Cut such items flush with masonry surfaces. Wall Pipe Sleeve Applications: Pipe sleeves shall be required for all new conduit penetrations through rated wall assemblies and non-rated CMU walls. EQUIPMENT PROVIDED UNDER ANOTHER DIVISION AND BY OTHERS The Installer of products under Divisions 26, 27, & 28 shall make all system connections required to equipment furnished and installed under another division and by others. 904 0 obj <>stream Reference letters from minimum of three (3) registered professional engineers, general contractors, building owners, explaining proficiency, quality of work, or other attribute on projects of similar size or substance. BASIC ELECTRICAL REQUIREMENTS . _^QD!;\m6~D#}g}F\jf#Mt2tNT%$PkQwJuhN)2>IL gVV[ NYo8 bT6&/"I9k8rq#|,p]UW.nD,e$#)GY9AV/8JWh(tsU T/! Only one submission per System Integrator will be allowed. Packaging: Premixed and factorypackaged. File Format: Coordination drawings shall be in a layered structure form as CAD Files or PDF Files for each floor with searchable text as follows: File Structure: The pdf or dwg files shall have separate layered structure for: Building Elements: Indicate each building element on separate layers, such as: Walls. Permit must be approved by UMB Department of Operations and Maintenance prior to performing energized work. As much as practical, connect equipment for ease of disconnecting, with minimum of interference with other installations. Provide service and operating manuals for the following: Division 28 Section Digital, Addressable Fire Alarm System. View Specification PDF - The Pennsylvania Turnpike. Shop drawings detailing fabrication and installation requirements for electrical equipment. PART 1 - GENERAL . General Specification for Electrical Works Abu Dhabi Sewerage Services Company ADSSC/GSEW Division 16 Section 16010 Electromagnetic Compatibility (EMC) Rev: 02 Jan. 2011 Page 6 of 7 6. endstream endobj 2010 0 obj <>stream This Section of the Specifications and its accompanying Drawings are made Services include: Electrical penetrations include conduits and cables. SECTION 16010 ELECTRICAL GENERAL PROVISIONS SECTION 16010 ELECTRICAL GENERAL PROVISIONS PART 1 - GENERAL 1.1 RELATED DOCUMENTS The general provisions of the contract including General and Special Conditions and General Requirements shall apply to all work under this Section. J{H5*aQDi!=GcN`H%{`8Zky:qr\a! Submit the work permit with the outage request. 6glqqS6&2S0gW ph p hf h8 >*B* Clearances for servicing and maintaining electrical equipment. Remove conduit, hangers, supports, etc. Contractor shall furnish manufacturer's electrical equipment of the types and sizes specified which has successfully operated for not less than the past two years, except where specific types are named by manufacturer and catalog number or designation under other Sections of the Contract Documents. These cookies do not store any personal information. All submitted materials and equipment are subject to approval by the A/E and UMB. Access shall be as required by code and/or as determined by the Architect and Engineer. RECORD DRAWINGS (As Built) Upon completion of the electrical installations, the Installer shall deliver to the Architect one (1) complete set of marked-up blueprints of the electrical contract drawings. SECTION 16010 - GENERAL PROVISIONS SECTION INDEX 1.0 General Conditions 12.0 General Description 13.0 Work Included 24.0 Codes, Inspection, Permits and Fees 35.0 Record Drawings 36.0 Shop Drawings, Samples and Other Submittals 47.0 Coordination 58.0 Minor Modifications 59.0 Guarantee 6 10.0 Approvals, Substitutions, Etc. 3 0 obj For equipment requiring seasonal operation, perform instructions for other seasons at the same time. Systems and Sub Systems: Indicate each system or sub system as warranted by congestion or complexity on separate layers such as: Examples of Systems: Lighting System. Calculations for battery capacity and voltage drop. %%EOF The operation of electrical equipment; required to achieve an outage must be accomplished by University personnel only. ELECTRICAL INSTALLATIONS General: Sequence, coordinate, and integrate the various elements of electrical systems, materials, and equipment. SECTION 16010 - GENERAL PROVISIONS. DEMOLITION: Remove and dispose of all existing materials not required for re-use or reinstallation. NEMA (National Electrical Manufacturers Association). Provide acoustical caulking to seal the annular spaces between the sleeve and the bare pipe or pipe insulation on each end with one half (1/2) inch caulking all around the annular space. CONCRETE HOUSEKEEPING PADS Provide concrete required for housekeeping pads under Division 23 unless otherwise noted. Variable frequency drives. o Reflected ceiling plan. !y-P+O`_ )q|ero-UPO]GmlQ^+RDdi*>Z ["R2VhL"F{V>,r&!#NLefBRD49e6D0u4$KyL !dU00BR0Cv1 n ~F ~ XB^c*x=.l0 r Follow supported equipment manufacturer's setting templates for anchor bolt and tie locations. Unless otherwise modified, provisions of General Conditions, Supplementary Conditions and Division-01 govern work under the Electrical Divisions. Refer to Division 01 Section "Definitions and Standards" for definition of "experienced Installer." Specifications and Drawings are prepared in abbreviated form and includes incomplete sentences. Control. Copy of Maryland Master Electrician's License. %PDF-1.5 % Replace ceiling tiles where removal has left holes or cuts in original tiles. 16 ELECTRICAL SPECIFICATION INDEX Section 16000 Bid Opportunity No. All work in Divisions 26, 27, and 28 shall comply with the latest version of following codes and regulations as adopted by the State of Maryland and the State Fire Marshal, unless otherwise specified. 0000002809 00000 n GUARANTEE/WARRANTY: All materials, equipment, etc. hVKk@+{la b64j[`KARh3Vd$U!XLa 'f:dM%wwc@%nyS^7-ZygHmnH"*pEK&xD,wb76I]VGm)Z_j@vUMmuyhxy S[{_T ,((n&+~z?h~YrM`%Rb$I"s?)s #: +}[6 #F7fWnV={RvRz&QQ A`5~o4lo SI*XU'wSB$5)|9D xb 1mfaqs7&YDE/q$"B" Afp|ISKCyd: C#S `IzLCoqw^`rSG7*V VF7A,.V4P l#o{# in9E^mj`PcuVd5 Deliver all certificates to the Owner prior to final acceptance of work. Coordinate the installation of required supporting devices and set sleeves in poured in place concrete and other structural components as they are constructed. 611.0 Acceptance Test 612.0 Prepare reflected ceiling plans to coordinate and integrate installations, air outlets and inlets, light fixtures, communication systems components, cable trays, sprinklers, access doors and other ceiling mounted items. hVk0W=}Xl(&[Xa+ KLbHblwwdM-/cH/Iw?GJec&2%i0h2e5 }7$kFq$$2/[&4{MXymnX*paLB:lWl_-]'vYt./&veAy[rozmIted7m-z3mdSNr]McVEEy]6uN7Y G#ps(cG-RAUi,K(#XE\X* Vx\Qc `V)3KR$$%[.gg{q0he`H\b$8kP}}@Q }RVyO@T.T.tg11IQjxAFLi=d;k7H- Access doors. This instruction period shall consist of not less than five (5) eight (8) hour days. Coordinate requirements for access panels and doors where electrical items requiring access are concealed behind finished surfaces. %%EOF Job site and worker safety are the responsibility of the contractor. <>/ExtGState<>/ProcSet[/PDF/Text/ImageB/ImageC/ImageI] >>/MediaBox[ 0 0 595.44 841.68] /Contents 4 0 R/Group<>/Tabs/S/StructParents 0>> SEQUENCING AND SCHEDULING Coordinate electrical equipment installation with other building components. 1.1 GENERAL. 0 Properly store and handle all materials and equipment. NESC (National Electrical Safety Code). Cleaning. SECTION 16012 -- SUBMITTALS CONTRACTOR'S CERTIFICATION: Each submittal shall contain a certification stating that the . VARIANCES Where variances occur between the drawings and specifications or within either document itself, the item or arrangement of better quality, greater quantity or higher cost shall be included in the contract price. The lighting design shall have a cross-section of 2,5 mm and a circuit breaker of (1 x 10 A + N) - Minimum wire size shall be 2.5 mm. Cut, remove and legally dispose of selected electrical equipment, components, and materials as indicated, including but not limited to removal of electrical systems and equipment as indicated on the drawings and specifications and other electrical items made obsolete by the new Work. Each section of raceway must contain an equipment grounding wire bonded at each end and sized as required. 4 | SECTION-16000 1.02 A. Concrete shall be 3,500 psi twenty-eight (28) day compressive strength concrete and reinforcement bars as specified in the architectural specifications. By closing this banner, or continuing to use this website, you consent to the use of cookies. shall meet the requirements of the associated spec section(s). 301 and Section 16010 of these Specifications. Warranties and bonds. "$u D2iH>`:\ &Ea